Oman OCC has two production lines in operation. No.1 line with the design capacity 2000tpd was put into operation in October, 1983 and the second line was put into operation in 1998 with the same production capacity.This project is divided into two se...
CNBM undertook NRCC EPC project of Line I in Saudi Arabia in 2006. After the construction complete, CNBM production plant service team carried out commissioning for Line I and then rendered a two-year overall OM service, which also include t...