Oman OCC upgrade project

    Oman OCC has two production lines in operation. No.1 line with the design capacity 2000tpd was put into operation in October, 1983 and the second line was put into operation in 1998 with the same production capacity.
    This project is divided into two sections.
    Section 1: Modifying and upgrading the filters of raw mill, preheater and coolers of line No.1
    Section 2:Increasing the current production capacity 2200TPD of the line No.1 to 2700TPD.